Business justification for building development
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include (see comparison of work stages) and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
Within the Designing Buildings Wiki project plans, the business justification stage is the first stage, taking place once a business need has been identified which might result in a building project. This is analogous to the ‘Strategic definition’ stage of the RIBA Plan of Work, (See comparison of work stages), but includes more preparatory client activities, undertaken before consultants are appointed.
This stage involves creating an internal team to assess whether there is justification for the project at all. In the first instance, a statement of need is prepared, which is an initial attempt to describe the possible requirements of the project. It should be stressed that this may or may not result in an actual project, and even if a project is necessary, it may not require a new building.
A preliminary business case is then prepared which is a first attempt to justify the investment required by the potential project.
If it is then considered worth investigating the project in more detail, the client may then create an internal organisational structure for the project and assesses the nature of the consultant team that would be needed to proceed with the project. The client may then develop the statement of need into an initial strategic brief which provides sufficient information about the project to allow the appointment of a consultant team.
The client should then consider whether to proceed to the next stage where a consultant team would be appointed, feasibility studies undertaken, and options assessments carried out. Clearly this would involve significant expenditure.
As the business justification stage takes place before the appointment of the main consultant team that will deliver the project, the client may wish to appoint independent client advisers to help them.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.